Report
Contract NObs2799
Prepared by
James M. Anderson
Reviewed by
Thomas J. Defoe
A quick reference to the major sections and supporting test documentation found in this report.
|
Introduction
|
1 |
|
Process Investigations, Chronological Sequence
|
7 |
|
The Merco Method
|
7 |
|
The Open Mold, Hand Layup Process
|
10 |
|
The Wet Layup
|
10 |
|
Layup With Preimpregnated Cloths
|
11 |
|
Wet Layup With Thixotropic Resins
|
12 |
|
Tests, Chronological Sequence
|
14 |
|
3" x 16" Panel Tests
|
15 |
|
Water Transmission Tests
|
17 |
|
5" x 20" Panel Tests
|
18 |
|
Dow Chemical Co. Tests
|
21 |
|
University of Michigan Tests
|
22 |
|
New York Naval Shipyard Tests
|
23 |
|
9" x 60" Panel Tests
|
25 |
|
Basic Design Considerations
|
28 |
|
Local Design Details
|
30 |
|
The Hull Shell
|
30 |
|
The Stem
|
30 |
|
Deck Construction
|
31 |
|
The Keel
|
31 |